Description
Material: Metal |
Processing Technology: Metal Sheet Cutting, Bending, Press Riveting, Grinding and Polishing |
MOQ:1 piece |
Lead Time: 4 days for drawing; 15-18 days for conventional sheet metal products and 19-22 days if surface treatment needed |
Package: 1 piece/carton |
Applicable Device Types:
Production Line Control Equipment Metal Cabinet | Measuring Device Metal Cabinet |
Metal Housing for Elevators | Color Control Machine Cabinet |
High/low Temperature Equipment Enclosures | Custom Enclosures for Various Industrial Equipment |
Customization Options:
Material Customization: cold-rolled sheets, hot-rolled sheets, galvanized sheets, copper sheets, aluminum alloys, stainless steel and other materials |
Surface Treatment Customization: environmental protection spraying treatment, etc. |
Appearance Details Customization: Intelligent automatic control design, multi-screens, etc. |